MUNICIPAL ENGINEERING


Comprises the following: Feasibility studies, condition surveys and capacity assessments, flood and stormwater management, water distribution networks, bulk water supply pipelines, reservoirs, elevated water towers, pump stations and bulk pipelines, water and sewer reticulations and outfall sewers, storm water drainage systems and canals, flood line determination, attenuation dams, dam safety inspections and water and wastewater treatment.

Nyeleti Consulting – areas of specialisation:

  • Feasibility studies
  • Condition surveys and capacity assessments
  • Flood and stormwater management
  • Water demand, leakage and pressure management
  • Dam design and safety inspections
  • Pump stations and bulk pipelines
  • Water and wastewater treatment
  • Water-retaining structures
  • Water and sewer reticulations


GALLERY


A few photos of typical projects undertaken by Nyeleti's engineers.

COMPLETED PROJECTS


Projects successfully completed:

GEZINA BULK WATER


The Gezina Bulk Water Pipeline was constructed to replace an existing pipeline that reached the end of its design-life. The project entailed the construction of 8.3Km of ND500 steel pipeline and 18 concrete valve chambers. The final construction value of the project was approximately R65.4 million.

MPHEGO RESERVOIR


Mphego Village is located within the Thulamela Local Municipality area approximately 7km East of Thohoyandou. The primary objective of this project was to ascertain that Mphego and Tshikhudini villages receive adequate water supply and that there is sufficient storage for all two villages. Mphego has 1160 households and Tshukhudini has 1500, it was also a requirement that Mphego be fully reticulated with metered yard connections. Mphego's water reticulation network would be upgraded and pipes sized according to DWA guidelines. Pipe classes ranged from class 9 to 16. A new 2.4 ML concrete reservoir was required for the shortfall in storage capacity.

MALAMULELE WEST WATER RETICULATION PROJECT (RSW)


Malamulele West RWS project is a water Reticulation project done by Nyeleti Consulting at Malamulele for the Vhembe Municipality. It is composed of five phases made up of 21 villages in total. The first two stages are complete and the project is now currently in the third and fourth phase. The villages vary in sizes with Phaphazela being the biggest village made up of over 2000 stands and Tambaulate being the smallest with just 97 stands. The project scope ranges from water reticulation design (RDP standard) to design of storage reservoirs, elevated tanks and bulk pipelines.